Project Overview

GWW will be duplicating a section of pipe that carries water from our Lancefield Bore 3 to the local Water Filtration Plant (WFP).

Over the last 18-24 months the region has experienced ongoing dry conditions, and we’ve seen an increase in water usage across the north-west of our service region.

We're completing these works to strengthen the reliability of Lancefield's water supply by enabling water to flow to the WFP from both Bore 3 and Kerrie Reservoir at the same time, ensuring we can meet peak demand on hot summer days.

  • When will works take place?

    Works are expected to start in mid-September 2025.

    Construction will take place during the day between 7am and 5pm, Monday to Friday.

  • How long will works take to complete?

    Works will take about 3 months to complete.

    We will let you know as soon as possible if there are changes to our work timeline.

Where are we working?

The new pipeline will follow the alignment of the existing pipeline along Maloneys Road, between Parks Road and the water filtration plant.

  • Changes to traffic conditions

    There will be changes to traffic along Maloneys Road while construction takes place. This may include reduced speeds and temporary diversions in traffic flow.

    A traffic management crew will be on site to make sure that vehicles can continue to move safely around our site.

  • Construction noise and dust

    There will be construction noise and dust from machinery and vehicles during working hours.

    Noise during construction will be in line with Environmental Protection Agency (EPA) Victoria guidelines.

Provide a short summary of your question.

You have 150 characters left

Provide detailed information relating to your question.

You have 500 characters left

Select a respondent from the list that you would most like to answer your question.

Moderation Policy

These are the people that are listening and responding to your questions.

Project team

{{ question.username }} asked

{{question.description}}

{{ answer.respondent.name }}
| Edited

Answer this question

Select the respondent who will be marked as answering the question

Provide the answer to the question. Answer can be saved as draft and published when complete.

No questions found